← Back to all articles

Keeping material certificates and delivery notes for a machine build

At the end of a build, many customers ask for a document pack: material certificates for stainless or pressure parts, certificates of conformity for bought-in components, inspection reports for critical machined parts. If those papers were filed when the parts arrived, the pack takes an hour. If they were not, it takes days of searching inboxes.

Ask for documents in the RFQ, not after delivery

State in the RFQ and on the purchase order which documents must come with the parts. Suppliers price and plan for it, and you avoid chasing a certificate after the goods have shipped.

File each document against the part it belongs to

A delivery note covers a delivery; a material certificate covers a specific part or batch. Filing documents by supplier or by date makes them hard to find later. File them against the order line of the part, with a short note such as the certificate number.

Check the paperwork when you receive the goods

When a delivery arrives, check the quantity and the documents together. If a certificate is missing or wrong, record it as an issue on that line straight away, the same way you would record a short or damaged delivery.

Build the hand-over pack from the order lines

At FAT, go through the order lines of the machine and collect the documents attached to them. Lines without the required document are your to-do list.

Doing this in AssembleFlow

  • record partial deliveries against each PO line, with received and outstanding quantities
  • log shortages, wrong, damaged or rejected parts, and attach delivery notes and certificates

Each order line can hold a delivery note, material certificate, certificate of conformity, inspection report or other document (PDF or picture, up to 10 MB each, 10 per line), with an optional note such as a certificate number. Files are stored privately with the project and are copied when the project is duplicated.

Limits, honestly: documents belong to a part on an order line, not to the whole order. They cannot be emailed from the app and have no expiry dates.

Try it on one of your own machines: start a 14-day free trial (no card), or apply for the free 3-month pilot on one real machine build.

Ready to leave Excel behind?

Start your free 14-day AssembleFlow trial — no credit card required.

Start free trial