What goes wrong without one view
- Engineering does not know a part is late until assembly asks for it.
- Purchasing does not know which late part blocks which machine.
- Half an order arrives and the whole order gets ticked as received.
- A damaged part is found weeks later and nobody wrote down when.
How AssembleFlow handles it
Each machine gets one shared project with its parts list. From that list you can send RFQs and purchase orders straight to suppliers after checking stock. The Order List shows every purchase order of the project with its supplier and status (Draft, Sent, Confirmed, Ordered, Received), including the supplier's answer through the confirmation link.
When goods arrive, you record each delivery against the order line. The line shows what was ordered, what has arrived and what is still outstanding, for example 40 ordered, 28 arrived, 12 outstanding. A part is only ticked as received when the whole ordered quantity is in. If something is short, wrong, damaged or rejected, you log it on the line with the number of pieces and mark it settled when it is resolved. Delivery notes and certificates can be attached to the line.
Because engineering, purchasing and the shop floor look at the same live view of every build, you can see what a late part does to your FAT and SAT dates before assembly finds out.
Read more: How to track purchase orders and late parts and How to track partial deliveries and damaged parts without an ERP.
Two to three weeks before FAT, run the parts readiness check before a factory acceptance test.
What it does not do
AssembleFlow records what you tell it. It does not send automatic messages to suppliers about late deliveries. It does not add up repeated subassembly quantities, so export a "Parts only" BOM from your CAD system and import that.
More straight answers in the purchasing FAQ. The terms are explained in the machine building glossary. Still on spreadsheets? See AssembleFlow vs spreadsheets.
Building test rigs? See test stand builders.
Try it on one real machine
Start the 14-day free trial (no card), or ask for the free 3-month pilot on one real machine build.
How the pilot works: the free 3-month pilot.
Building robotic weld cells? See BOM and purchasing for welding automation builders.