Where weld cell builds usually slip
- One late part holds up the run-off. A clamp, a sensor or a guard panel that arrives late can stop final assembly and push the FAT date.
- Fixtures change during design. Fixture parts are often still being revised while the first purchase orders go out, so the buyer and the designer need to look at the same list.
- Short or rejected deliveries. Fabricated frames and machined fixture parts sometimes arrive short, damaged or out of tolerance, and the replacement has to be tracked until it arrives.
- Certificates. Some customers ask for material certificates or certificates of conformity for parts of the cell.
- Job cost. The real cost of a cell is often known only when the last invoice comes in.
More on this: late parts tracking for custom machine builders and the machine build purchasing checklist.
How AssembleFlow helps
Each cell or machine gets one shared project where you can:
- import the BOM from Excel or your CAD export
- send RFQs and purchase orders straight from the parts list, after checking stock
- see what a late part does to your FAT and SAT dates
- record partial deliveries against each PO line, with received and outstanding quantities
- log shortages, wrong, damaged or rejected parts, and attach delivery notes and certificates
- track job cost against budget and turn it into a customer quote
- produce a priced spare parts list and a parts manual for each customer
For example, if 40 clamps were ordered and 28 have arrived, the PO line shows 12 outstanding, and the part is only marked received when all 40 are in.
Honest limits
AssembleFlow imports BOMs as spreadsheets (CSV, XLSX, XLSM, XLS). It cannot open native CAD files. It does not roll up quantities through subassemblies or merge identical part numbers into one PO line, so import a "Parts only" (flat) BOM to get one line per part with its total quantity. It records delivery issues but does not send messages to suppliers or run a returns or credit-note workflow. Delivery documents are attached per PO line, not to the whole order.
Designing in SolidWorks? See from a SolidWorks BOM to purchase orders. Prefer to start in Excel? Use the free templates.
Try it on one of your own weld cells
Send us the Excel BOM of one cell, an old or finished one is fine, and we will set it up for you. Or start the 14-day free trial, no card needed. See how the 3-month pilot works.
Building robotic cells too? See BOM and purchasing for robotic cell builders.
Building presses or forming equipment? See BOM and purchasing for press and forming equipment builders.
Other industries: Packaging machine builders, Test stand builders, Converting machine builders, Medical device automation builders, Food processing machine builders, Robotic cell builders, Material handling equipment builders, Inspection and vision machine builders, Press and forming equipment builders, Assembly automation builders.
Frequently asked questions
Can I keep a separate parts list for each weld cell?
Yes. Each machine or cell is its own project with its own parts list, and stock is shared across all jobs.
Can I record a fixture part that arrived damaged?
Yes. On the PO line, record a Damaged (or Shortage, Wrong item, Rejected) issue with the number of pieces and details, and mark it settled when the replacement arrives. The replacement is recorded as a normal receipt.
Can I attach material certificates?
Yes. Attach delivery notes, material certificates, certificates of conformity or inspection reports (PDF or pictures) to each PO line.
How do I try it?
Start the 14-day free trial without a card, or, if you are a small machine builder, request the free 3-month pilot on one real build.