For inspection and vision machine builders

BOM and purchasing for inspection and vision machine builders

An inspection machine is a mix of long-lead bought-in items, like cameras, lenses, lighting, sensors, PLCs and safety parts, and your own frames, guarding, fixtures and conveyors. AssembleFlow keeps the parts list, the purchase orders, the deliveries and the delivery documents for each machine in one shared project.

Where inspection machine projects slip

  • A camera, lens or light has the longest lead time, and nobody sees how its delivery date affects the FAT date.
  • Mechanical parts come from several suppliers and arrive in part lots, so "received" on the PO does not mean everything is in.
  • The same sensors and connectors are used on several machines, and stock is not visible across jobs.
  • Calibration certificates and delivery notes end up in email folders instead of with the part.

More on this: late parts tracking for custom machine builders.

How AssembleFlow helps

  • import the BOM from Excel or your CAD export
  • keep one parts list per machine, with shared stock across all jobs
  • send RFQs and purchase orders straight from the parts list, after checking stock
  • see what a late part does to your FAT and SAT dates
  • record partial deliveries against each PO line, with received and outstanding quantities
  • log shortages, wrong, damaged or rejected parts, and attach delivery notes and certificates

For example, if 40 M12 cables were ordered and 28 have arrived, the PO line shows 12 outstanding, and the part is only marked received when all 40 are in.

Honest limits

AssembleFlow does not roll up quantities through subassemblies or merge identical part numbers into one purchase order line: export a "Parts only" (flat) BOM from your CAD system, which lists each part once with its total quantity, and import that file. Documents are attached to a part on an order line, not to the whole order, and they have no expiry dates.

How to get a flat BOM out of your CAD system: CAD BOM export guides.

Try it on one real build

Start a 14-day free trial, no card needed. Or apply for the free 3-month pilot on one real machine build: send the Excel BOM of one machine and Erkan sets it up for you. See how the pilot works.

Prefer to start in Excel? Use the free purchase order tracker.

Building test stands too? See BOM and purchasing for test stand builders.

Other industries: Packaging machine builders, Test stand builders, Welding automation builders, Converting machine builders, Medical device automation builders, Food processing machine builders, Robotic cell builders, Material handling equipment builders, Press and forming equipment builders, Assembly automation builders.