Where food machine builds usually slip
- Fabrications and long-lead parts. Stainless fabrications and some drives have long lead times, and one late item can stop final assembly and push the FAT date.
- The same parts in several machines. Bearings, seals and fasteners are used across many jobs, so it is easy to order twice or to use stock meant for another machine.
- Material paperwork. Material certificates and certificates of conformity for product-contact parts end up in email threads and paper folders.
- Short or damaged deliveries. A fabricated part that arrives scratched, short or wrong has to be tracked until the replacement is in.
- Spare parts for the customer. After delivery, the customer asks for a priced spare parts list for the machine.
More on this: late parts tracking for custom machine builders and the machine build purchasing checklist.
How AssembleFlow helps
Each machine gets one shared project where you can:
- import the BOM from Excel or your CAD export
- keep one parts list per machine, with shared stock across all jobs
- send RFQs and purchase orders straight from the parts list, after checking stock
- see what a late part does to your FAT and SAT dates
- record partial deliveries against each PO line, with received and outstanding quantities
- log shortages, wrong, damaged or rejected parts, and attach delivery notes and certificates
- produce a priced spare parts list and a parts manual for each customer
For example, if 40 bearings were ordered and 28 have arrived, the PO line shows 12 outstanding until the last lot is received.
Want to start in Excel? The free templates include a spare parts list template.
Honest limits
AssembleFlow is BOM, purchasing, stock, project-cost and quotation software. It does not check sanitary design or food-contact compliance, and it is not a quality management system. Documents are attached per PO line, not to the whole order, and have no expiry dates. AssembleFlow imports BOMs as spreadsheets (CSV, XLSX, XLSM, XLS) and cannot open native CAD files. It does not roll up quantities through subassemblies or merge identical part numbers into one PO line, so import a "Parts only" (flat) BOM to get one line per part with its total quantity. There is no per-part price history across orders or projects.
Try it on one of your own machines
Send us the Excel BOM of one machine, an old or finished one is fine, and we will set it up for you. Or start the 14-day free trial, no card needed. See how the 3-month pilot works.
Other industries: Packaging machine builders, Test stand builders, Welding automation builders, Converting machine builders, Medical device automation builders, Robotic cell builders, Material handling equipment builders, Inspection and vision machine builders, Press and forming equipment builders, Assembly automation builders.
Frequently asked questions
Can I attach material certificates to a delivery?
Yes. Attach delivery notes, material certificates, certificates of conformity or inspection reports (PDF or pictures) to each PO line, with an optional note such as a certificate or heat number.
Can stock be shared between machines?
Yes. Stock is shared across all jobs. When one stock item matches several rows, Apply Stock shares the available quantity between them.
Can I give the customer a spare parts list?
Yes. AssembleFlow produces a priced spare parts list and a parts manual for each customer.
How do I try it?
Start the 14-day free trial without a card, or, if you are a small machine builder, request the free 3-month pilot on one real build.