Where handling projects slip
- Quantities come from a layout that changes late, and the BOM in purchasing is not the latest one.
- Bought-in drives and motors have long lead times and arrive in part lots.
- The same standard parts are used across several projects, and stock is not visible.
- Job cost is found out after installation.
More on this: late parts tracking for custom machine builders and job costing for machine builders.
How AssembleFlow helps
- import the BOM from Excel or your CAD export
- keep one parts list per machine, with shared stock across all jobs
- send RFQs and purchase orders straight from the parts list, after checking stock
- record partial deliveries against each PO line, with received and outstanding quantities
- log shortages, wrong, damaged or rejected parts, and attach delivery notes and certificates
- track job cost against budget and turn it into a customer quote
For example, if 5 screws are used in each of 8 assemblies, order 40. If 28 have arrived, the PO line shows 12 outstanding until the last lot is received.
Honest limits
AssembleFlow is BOM, purchasing, stock, project-cost and quotation software, not layout or conveyor design software. It imports BOMs as spreadsheets (CSV, XLSX, XLSM, XLS) and cannot open native CAD files. It does not roll up quantities through subassemblies or merge identical part numbers into one purchase order line, which matters when the same roller or bearing appears in many subassemblies: export a "Parts only" (flat) BOM from your CAD system, which lists each part once with its total quantity, and import that file. The guide How to total subassembly quantities in a multi-level BOM shows how.
Prefer to start in Excel? Use the free templates.
Try it on your next system
Start the 14-day trial without a card, or, if you are a small machine builder, request the free 3-month pilot on one real build. See how the pilot works.
Other industries: Packaging machine builders, Test stand builders, Welding automation builders, Converting machine builders, Medical device automation builders, Food processing machine builders, Robotic cell builders, Inspection and vision machine builders, Press and forming equipment builders, Assembly automation builders.
Frequently asked questions
My BOM has the same part in many subassemblies. Will AssembleFlow add them up?
No. Export a Parts only (flat) BOM from your CAD system, which already lists each part once with its total quantity, and import that file.
Can several projects share one stock?
Yes. Each project has its own parts list, and stock is shared across all jobs.
Can I record deliveries that arrive in several lots?
Yes. Each PO line shows ordered, received and outstanding quantities.
What does it cost?
Workshop $29/month and Factory $59/month per organization, with a 14-day free trial without a card.