A robotic cell mixes long-lead bought-in items, like the robot, controller, safety scanners and grippers, with your own fabricated frames, guarding and fixtures. AssembleFlow keeps the parts list, the purchase orders, the deliveries and the delivery documents for each cell in one shared project.

Where cell projects slip

  • The robot or a safety component has the longest lead time, and its delivery date is not linked to the FAT date.
  • Guarding, base plates and gripper parts are ordered from several suppliers and arrive in part lots.
  • The same sensors and connectors are used in several cells at once, and nobody knows what is in stock.
  • Job cost is known only after the cell has shipped.

More on this: late parts tracking for custom machine builders and job costing for machine builders.

How AssembleFlow helps

  • import the BOM from Excel or your CAD export
  • keep one parts list per machine, with shared stock across all jobs
  • send RFQs and purchase orders straight from the parts list, after checking stock
  • see what a late part does to your FAT and SAT dates
  • record partial deliveries against each PO line, with received and outstanding quantities
  • track job cost against budget and turn it into a customer quote

For example, if 40 cable glands were ordered and 28 have arrived, the PO line shows 12 outstanding, and the part is only marked received when all 40 are in.

Honest limits

AssembleFlow is BOM, purchasing, stock, project-cost and quotation software. It is not robot programming, simulation or safety validation software. It imports BOMs as spreadsheets (CSV, XLSX, XLSM, XLS) and cannot open native CAD files. It does not roll up quantities through subassemblies or merge identical part numbers into one purchase order line: export a "Parts only" (flat) BOM from your CAD system, which lists each part once with its total quantity, and import that file.

Designing in SolidWorks? See the SolidWorks guide. Other CAD systems: CAD BOM export guides. Prefer to start in Excel? Use the free templates.

Try it on your next cell

Start the 14-day trial without a card, or, if you are a small machine builder, request the free 3-month pilot on one real build. See how the pilot works.

Building custom assembly machines? See BOM and purchasing for assembly automation builders.

Other industries: Packaging machine builders, Test stand builders, Welding automation builders, Converting machine builders, Medical device automation builders, Food processing machine builders, Material handling equipment builders, Inspection and vision machine builders, Press and forming equipment builders, Assembly automation builders.

Frequently asked questions

Can I use one stock for several cells?

Yes. Each cell has its own parts list, and stock is shared across all jobs.

Can I see which parts are late for a cell?

Yes. Delivery dates are tracked per PO line and you can see what a late part does to your FAT and SAT dates.

Does AssembleFlow program or simulate robots?

No. It handles the BOM, purchasing, stock, project cost and quotes.

What does it cost?

Workshop $29/month and Factory $59/month per organization, with a 14-day free trial without a card.

Start the 14-day trial Request the 3-month pilot