For test stand builders

BOM and purchasing for test rig and test stand builders

A test stand is rarely built twice the same way. Each one mixes bought-in instruments, sensors, valves, DAQ hardware and frames, and many of those parts have long lead times and need certificates. When a pressure transducer or a load cell arrives late, short or without its calibration certificate, the whole build waits, and so does the FAT.

AssembleFlow was built by a mechanical design engineer for small machine builders. Each test stand gets one shared project where you can:

  • import the BOM from Excel or your CAD export
  • send RFQs and purchase orders straight from the parts list, after checking stock
  • record partial deliveries against each PO line, with received and outstanding quantities
  • log shortages and wrong, damaged or rejected parts, and attach delivery notes and certificates
  • see what a late part does to your FAT and SAT dates
  • track job cost against budget and turn it into a customer quote

Certificates where you need them

On each purchase order line you can attach a delivery note, a material certificate, a certificate of conformity, an inspection report or another document, as a PDF or a picture. A note such as a certificate number can go with each file. The paperwork for a sensor stays with the order line it arrived on, so you are not hunting through email when the customer asks for it.

Partial deliveries without a spreadsheet

Instruments often arrive in lots. If 40 fittings were ordered and 28 arrived, the order line shows 12 outstanding, and the part is only ticked as received in the parts list when all 40 are in. A shortage or a damaged item is recorded as an issue on the line and closed when the replacement or credit note arrives.

One parts list per build, shared stock

Each test stand has its own parts list. Stock is shared across all your jobs, so a spare valve on the shelf is used before you buy another.

Honest limits

AssembleFlow imports BOMs as spreadsheets (CSV, XLSX, XLSM, XLS). It cannot open native CAD files. It does not roll up quantities through subassemblies or merge identical part numbers into one PO line, so import a "Parts only" (flat) BOM to get one line per part with its total quantity. It records delivery issues but does not send messages to suppliers or run a returns workflow.

Terms such as FAT, SAT and CoC are explained in the machine building glossary.

Try it on one of your own test stands

Small machine builders can request a free 3-month pilot on one real build. Each request is approved by hand, and the pilot includes the Factory plan. Or start a 14-day trial with no card. Plans start at $29 per month per organization.

Building inspection or vision machines? See BOM and purchasing for inspection and vision machine builders.

Other industries: Packaging machine builders, Welding automation builders, Converting machine builders, Medical device automation builders, Food processing machine builders, Robotic cell builders, Material handling equipment builders, Inspection and vision machine builders, Press and forming equipment builders, Assembly automation builders.

Request the 3-month pilot Start the 14-day trial