Where these builds usually slip
- One late part holds up the FAT. A sensor, a vision component or a machined nest that arrives late can stop final assembly and push the FAT date.
- Nests and fixtures change during design. Product-contact parts are often still being revised while the first purchase orders go out, so the buyer and the designer need to look at the same list.
- Paperwork for parts. Customers may ask for material certificates, certificates of conformity or inspection reports for certain parts, and these get lost between email, shared drives and paper folders.
- Short or rejected deliveries. Precision parts sometimes arrive short or out of tolerance, and the replacement has to be tracked until it is in.
- Job cost. The real cost of the machine is often known only when the last invoice comes in.
More on this: late parts tracking for custom machine builders and the machine build purchasing checklist.
How AssembleFlow helps
Each machine gets one shared project where you can:
- import the BOM from Excel or your CAD export
- send RFQs and purchase orders straight from the parts list, after checking stock
- see what a late part does to your FAT and SAT dates
- record partial deliveries against each PO line, with received and outstanding quantities
- log shortages, wrong, damaged or rejected parts, and attach delivery notes and certificates
- track job cost against budget and turn it into a customer quote
- produce a priced spare parts list and a parts manual for each customer
For example, if 40 sensors were ordered and 28 have arrived, the PO line shows 12 outstanding, and the part is only marked received when all 40 are in. Material certificates, certificates of conformity and inspection reports can be attached to that PO line as PDF files or pictures.
Honest limits
AssembleFlow is BOM, purchasing, stock, project-cost and quotation software. It is not a quality management system, and it does not make your machine, your process or your records compliant with any medical device standard or regulation. Documents are attached per PO line (up to 10 per line, 10 MB each), not to the whole order, and have no expiry dates. AssembleFlow imports BOMs as spreadsheets (CSV, XLSX, XLSM, XLS) and cannot open native CAD files. It does not roll up quantities through subassemblies or merge identical part numbers into one PO line, so import a "Parts only" (flat) BOM to get one line per part with its total quantity. It records delivery issues but does not send messages to suppliers or run a returns or credit-note workflow.
Designing in SolidWorks? See from a SolidWorks BOM to purchase orders. Prefer to start in Excel? Use the free templates.
Try it on one of your own machines
Send us the Excel BOM of one machine, an old or finished one is fine, and we will set it up for you. Or start the 14-day free trial, no card needed. See how the 3-month pilot works.
Other industries: Packaging machine builders, Test stand builders, Welding automation builders, Converting machine builders, Food processing machine builders, Robotic cell builders, Material handling equipment builders, Inspection and vision machine builders, Press and forming equipment builders, Assembly automation builders.
Frequently asked questions
Can I attach material certificates and certificates of conformity?
Yes. Attach delivery notes, material certificates, certificates of conformity, inspection reports or other documents (PDF or pictures) to each PO line, with an optional note such as a certificate number.
Is AssembleFlow validated for regulated use?
No. It is a purchasing and BOM tool for the machine builder and makes no compliance claims. Keep your quality records in the system your quality process requires.
Can I record a part that arrived out of tolerance?
Yes. On the PO line, record a Rejected (or Shortage, Wrong item, Damaged) issue with the number of pieces and details, and mark it settled when the replacement arrives. The replacement is recorded as a normal receipt.
How do I try it?
Start the 14-day free trial without a card, or, if you are a small machine builder, request the free 3-month pilot on one real build.