Glossary

Machine building glossary

Short definitions of the words that come up when you design, buy parts for and ship a custom machine. Written by a mechanical design engineer.

BOM (bill of materials)

The list of every part and assembly needed to build a machine, with quantities. For a machine builder the BOM usually starts in the CAD system and ends up in a spreadsheet or purchasing tool.

Parts only BOM (flat BOM)

A BOM type, offered by some CAD systems, that lists each part once with its total quantity for the whole assembly instead of repeating parts under every subassembly. It is the easiest export to buy from, because the quantities are already added up. In AssembleFlow you export this file as a spreadsheet and import it with the Import BOM wizard.

How to export one: from SolidWorks or from Inventor.

Subassembly

A group of parts that is built or bought as a unit and then used in the machine, sometimes several times.

Read more: How to total subassembly quantities in a multi-level BOM.

Qty per machine

How many of a part one machine needs. Multiply by the number of machines in the project to get the quantity to buy.

RFQ (request for quotation)

A request sent to suppliers asking for price and delivery time for a list of parts before you order.

PO (purchase order)

The order you send to a supplier. It lists the parts, quantities, prices and the delivery date you expect.

MOQ (minimum order quantity)

The smallest quantity a supplier will sell. If you need 40 screws but the MOQ is 100, you pay for 100 or find another source.

Lead time

The time between placing an order and receiving the goods. Long lead time parts decide when you must order, not when you need them.

Partial delivery

A supplier ships part of an order now and the rest later. For example, 40 ordered, 28 arrived, 12 outstanding. You need to record what arrived against the PO line, not just tick the order as received.

Read more: How to track partial deliveries and damaged parts without an ERP.

Delivery issue

A shortage, wrong item, damaged part or rejected part found when goods arrive. It should be written down with the number of pieces and what was agreed with the supplier.

CoC (certificate of conformity)

A document from the supplier stating that the goods meet the specification. Along with material certificates and inspection reports, it is often needed in the machine's documentation.

FAT (factory acceptance test)

The customer's check that the finished machine works as specified, done at the builder's site before shipping.

Before the test: Parts readiness before a factory acceptance test.

SAT (site acceptance test)

The same kind of check after the machine has been installed at the customer's site.

Read more: Machine build project schedule: milestones from order to FAT and SAT.

ETO (engineer-to-order)

A way of working where each product is designed to a customer's order. Most custom machine builders work this way.

Job cost

What a machine actually cost to build (parts, labor, outside services), compared against the budget used to quote it.

Spare parts list

A list of the parts a customer may need to keep for the machine, with part numbers and prices, delivered with the machine.

How to build one: Recommended spare parts lists for custom machines.

Try it on one real machine

AssembleFlow keeps one parts list per machine, from import to purchase order to delivery. Try it free for 14 days with no card, or ask for the free 3-month pilot on one real machine build.

See also: Purchasing and receiving FAQ.