Parts readiness before a factory acceptance test: a purchasing check for machine builders

Most FAT checklists start when the machine is assembled. But many FAT dates slip earlier, in purchasing: one part still on order, one rejected delivery that was never replaced, one material certificate nobody can find. This short check helps you find those gaps two to three weeks before the date you give your customer.

1. Every PO line received in full

Go through every purchase order for the machine and look at each line, not just the order. A PO can look "received" when the first box arrives. Check ordered, received and outstanding quantities per line. Example: 40 fittings ordered, 28 arrived, 12 outstanding. That line is not done.

2. No open delivery issues

List every shortage, wrong item, damaged or rejected part that has not been settled. A rejected part that was sent back is not on the shelf, even if the PO looks complete. More on this: how to track partial deliveries and damaged parts without an ERP.

3. Certificates and delivery notes attached

If the customer will review material certificates, certificates of conformity or inspection reports at FAT, check now that each one is filed against the part it belongs to. Finding a missing certificate on FAT day is too late to get it from the supplier.

4. Late parts checked against the FAT date

For every line still outstanding, compare the supplier's promised date with the date the part must be fitted. If it arrives after the FAT date, decide now: chase the supplier, find another source, or agree with the customer what will be shown at FAT. See also late parts tracking for custom machine builders.

5. Spare parts list matches the machine as built

If a part was swapped during the build, the spare parts list must show the part that is actually fitted, with an orderable manufacturer part number. Many buyers check this at FAT. How to build one: recommended spare parts lists for custom machines.

6. One list everyone looks at

Engineering, purchasing and the shop floor should look at the same parts list. If the answer to "is everything here?" depends on which spreadsheet you open, the check above takes days instead of an hour.

Not sure what FAT, SAT or CoC mean? See the machine building glossary.

Doing this in AssembleFlow

In AssembleFlow you can:

  • record partial deliveries against each PO line, with received and outstanding quantities
  • log shortages, wrong, damaged or rejected parts, and attach delivery notes and certificates
  • see what a late part does to your FAT and SAT dates
  • give engineering, purchasing and the shop floor the same live view of every build

Limits, honestly: receiving is recorded on the Order List tab, documents belong to a part on an order line (not to the whole order), and a delivery issue is a record: AssembleFlow does not send messages to the supplier or run a return or credit-note workflow.

Prefer to start in Excel? The free purchase order tracker on /templates shows ordered, received and outstanding quantities per line, with no sign-up.

Check your next build before FAT

Start the 14-day trial without a card, or request the free 3-month pilot on one real machine build.